--> Figure 15

Datapages, Inc.Print this page

Figure 15. L10 net-oil isopach at the time C20st horizontal was drilled, South Pass 62 field. Several million bbl of oil had been produced, and reservoir pressures had been depleted to approximately 700 psi. Bottom-hole pressures indicated that the reservoirs were in communication either through the downdip aquifer or across faults.