How Geocellular Models Handle Net Pay Isochore Mapping Issues

 

David Hamilton, Subsurface Computer Modeling

Most net pay mapping issues occur in areas where gross pay thickness tapers from full zone thickness down to zero at the fluid contact, the wedge zone.  In traditional mapping projects a zone’s net pay is calculated at each well and those values used to build a net pay contour map.  In areas of full zone thickness simple contour drawing techniques are used.  In wedge zones care must be taken to account for vertical variations in pay distribution.  When pay has a uniform vertical distribution through the zone, net pay values taper smoothly to zero in the wedge zone.  When pay is not uniformly distributed vertically through the zone, then net pay contours will drop quickly towards zero upon entering the wedge (pay in bottom half of zone) or contour values will stay relatively high through much of the wedge (pay in top half of zone) until going to zero at the wedge edge.

When hand mapping, the “Walking Wells Out of Water” technique is traditionally used to account for vertical variations in pay through the wedge zone.  When using the computer to calculate pay contours, supplemental data (based on the Walking Wells Out of Water technique) or special data tie techniques are used in the wedge zone.  These techniques honor wedge zone pay values, keep their influence from extending outside the wedge zone, and, if carefully implemented, provide a good representation of pay distribution within the wedge.

Geocellular modeling attempts to model vertical variations in a reservoir zone. It does this by separating the mapping area into cells laterally (typically 50 to 100 units on a side) and then breaking the reservoir vertically into thin layers.  One reservoir my have ten to hundreds of layers depending upon its total thickness and how thin individual sands and shales are.  The goal is to build a model that has each significant sand or shale assigned to one or more layers.  When done correctly, the vertical variation seen in the reservoir is built into the model.  Those cells that are classed as pay are assigned a pay ratio value of 1.0 and those that are not pay are assigned a value of 0.0 (pay ratios between 0.0 and 1.0 can be used).  Of course, all cells below the fluid contact are assigned a ratio value of 0.0.  The following steps are used to convert the model’s cell values into a net pay contours:

  1. The thickness of each layer in each cell is multiplied by its pay ratio value creating a pay thickness for each layer of the cell
  2. The pay thickness from each cell’s vertical stack of layers is summed and assigned to the cell center
  3. The total pay thickness at the center of each cell is used to generate a contour map.

Because each pay sand is modeled through the reservoir and into the wedge zone and because those sand thicknesses (pay values) are summed vertically, the pay contours generated from that summation accurately map the distribution of pay through the wedge zone

 

AAPG Search and Discovery Article #90098©2009 AAPG Education Department, Houston, Texas 9-11 September 2009

 

 

 

����������������������������������������������������������������������������������������������������������������