Click to view Poster in PDF format.
(7.48 MB)
PSCase Study for
Selecting and Implementing Practical and Cost-Effective Technologies to
Remediate
Soil
and Groundwater from Natural Gas Compression Facilities, West
Panhandle Field, Texas*
Brent A. Miller1, Michael Jacobs2 and Kyle Hughes3
Search and Discovery Article #80049 (2009)
Posted June 10, 2009
*Adapted from poster presentation at AAPG International Conference and Exhibition, Cape Town, South Africa, October 26-29, 2008.
1Geosyntec Consultants, Tacoma, WA ([email protected] )
2Pioneer Natural Resources USA, Midland, TX
3Pioneer Natural Resources USA, Amarillo, TX
In 2001, an environmental assessment of
soil
and groundwater
contamination associated with natural gas production was conducted by Pioneer
Natural Resources USA Inc. The gas compression and production facilities are
located in the West Panhandle Field, Moore and Potter Counties, Texas, and have been in operation since the 1930s. Shallow and/or deep
soil
contamination,
primarily from used lube oil and natural gas condensate was discovered at most
of the gas compression facilities. Limited amounts of non-aqueous phase liquids
(NAPL) were observed on shallow perched water-bearing zones at two sites and
dissolved phase (BTEX) plumes with benzene concentrations exceeding drinking
water standards were observed at a total of six sites. The depths to the
shallow perched water-bearing zones at these sites varied from approximately 20
to 40 feet below ground surface.
Pioneer Natural Resources USA, Inc. designed a proactive,
practical, and cost effective program for the selection and implementation of
active systems to remediate these sites as part of the Operator and Voluntary
Cleanup Programs (OCP/VCP) administered by the Railroad Commission of Texas. In
2005, five biovent (BV), two
soil
vapor extraction (SVE), one biosparging (BS),
and one multiphase extraction (MPE) systems were designed, constructed, and
operated to achieve cleanup of
soil
and groundwater at the six sites.
Remediation was completed at five of the six sites within two years of startup,
with completion of the final site expected in 2008.
In 2005, the remediation program was nominated by the Texas Railroad Commission for the Interstate Oil and Gas Compact Commission’s Environmental Stewardship Award and received Honorable Mention.
|
In 2001, an environmental assessment of
Pioneer Natural Resources USA, Inc. designed a proactive, practical, and cost effective program for the selection and implementation of active systems to remediate these sites as part of the Operator and Voluntary Cleanup Programs (OCP/VCP) administered by the Railroad Commission of Texas.
Pipeline condensate, lube oils, and coolants were released from ASTs, USTs, compressor pads, scrubbers, separators and other process equipment. Benzene, Toluene, Ethylbenzene, and Xylenes (BTEX), and TPH are the primary contaminants of concern. Free-phase NAPL was observed at two sites.
In 2005, five biovent (BV), two (Figure 3)
Impacted shallow soils were excavated, treated on-site via
50,000 cubic yards of
The bioventing system design included installing temporary, transferable, prefabricated venting equipment that required minimal infrastructure, low O&M requirements, and were convertible to SVE operation. (Figure 6)
Main system components included bioventing wells, transfer piping (PVC), venting equipment, flow meters and pressure gauges, and electrical control equipment.
Bioventing systems were operated at 5 sites to treat vadose zone soils. All systems achieved cleanup goals below TRRP cleanup levels (benzene <0.026 mg/kg, TPH <210 mg/kg). Remediation was completed within 18 months at all sites. (Figure 7)
The SVE system design included installing temporary, transferable, prefabricated venting equipment that required minimal infrastructure, low O&M requirements, vapor treatment, and were convertible to bioventing operation. (Figure 8)
Main system components include SVE wells, transfer piping (PVC), extraction equipment, flow meters and pressure gauges, vapor phase granular activated carbon vessels, and electrical control equipment.
SVE systems were operated at 2 sites to treat high TPH concentration vadose zone soils. Both systems were operated for approximately one month before they were converted to bioventing operation to complete the final treatment. (Figure 9)
The DPE system design included installing temporary, transferable, prefabricated extraction system that required minimal infrastructure, moderate O&M requirements, vapor treatment, and groundwater disposal (deep well injection). (Figure 10)
Main system components include DPE wells, transfer piping (PVC), extraction equipment, flow meters and pressure gauges, electric catalytic oxidizer, and electrical control equipment.
A DPE system was installed at on site to remove LNAPL and treat
impacted
The biosparge system design included installing temporary, transferable, prefabricated sparge equipment that required minimal infrastructure and low O&M requirements.
Main system components include biosparge wells, transfer piping (PVC), sparge equipment, flow meters and pressure gauges, and electrical control equipment.
One biosparge system was installed to treat dissolved phase hydrocarbons. A series of 7 wells were installed on the property boundary as a barrier to treat hydrocarbons migrating from the site. The system is currently in operation. (Figure 12)
In 2005, the remediation program was nominated by the Texas Railroad Commission for the Interstate Oil and Gas Compact Commission’s Environmental Stewardship Award and received Honorable Mention.
|