Click to view page image in pdf format.
7th Middle East Geosciences Conference and Exhibition
Manama, Bahrain
March 27-29, 2006
1 Chevron Energy Technology Company, 1500 Louisiana, Houston, TX 77002, phone: 832-854-6724,
[email protected]
2 Chevron Energy Technology Company, 1500 Louisiana, Houston,
77002
A consistent design of experiments (DoE) based evaluation process was used to assess the magnitude of OOIP uncertainty
as well as the relative contributions from uncertainty
sources
as a function of the historical development of the Humma
Marrat reservoir in the Partitioned Neutral Zone (PNZ). The Jurassic-age limestone and dolomite Humma Marrat reservoir
was discovered in 1998 and currently has five producers. The two additional delineation wells and two horizontal sidetracks
drilled in 2005 are included in the study. Within the Marrat interval, three stratigraphic layers, known informally as the A, C,
and E zones, are known to produce significant oil. Based on limited PLT data, approximately 70-75% of the current oil
production is from the lower-most E zone, 15-20% from the A zone, and the remainder from the C zone.
The uncertainty
sources
in the DoE-based evaluation were: (1) structure (time-to-depth conversion and
seismic
interpretation uncertainty; (2) original oil-water contact (OOWC); (3) porosity histogram, and; (4) oil saturation histogram. All
uncertainties except structure were evaluated independently for the A, C, and E zones. High, mid, and low-case values
were determined using only the well log, core, and
seismic
data available after each well was drilled or as significant new
data became available (e.g. reprocessed
seismic
volume in mid-2004). The time period covered by this look-back is from
2000 to late 2005.
Analysis of the DoE-based results show that the statistically significant contributors to OOIP uncertainty varied considerably
as wells were drilled. The study results suggest that consistent use of a quantitative uncertainty assessment tool such as
DoE may reduce the
number
of delineation wells needed and significantly impact delineation well location decisions.