Click to view page image in pdf format.
7th Middle East Geosciences Conference and Exhibition
Manama, Bahrain
March 27-29, 2006
1 Exploitation Dept, PT. Pertamina (Persero) DOH JBB - Indonesia, JL. Patra Raya 1 - Cirebon West Java Indonesia, Cirebon, 45151, Indonesia, phone: 62-231-2512592,
[email protected]
2
Development
Dept, PT. Pertamina (Persero ) DOH JBB - Indonesia, JL. Patra Raya 1 - Cirebon West Java Indonesia, Cirebon, Indonesia
The very conducive atmosphere of oil business at the moment where price of world oil have reached the level of above US$
60 /bbl, making as incentive and accelerator for Pertamina to study immediately the newly or marginal structure of
prospected oil
production
. The integrated of acceleration project concept has been compiled and in implemented on the
new field finding of Structure " KRB", with the projection that in a short time can give contribution to significant oil
production
. This Structure " KRB" was found in the beginning of 2004 marked by successfully exploration well KRB -01 as a
gas and oil producer.
Although, the existence of reservoir data was limited, where PVT and SCAL has not been done yet and the producing well
is only one at the moment, but by doing various innovation and study literature, compiled framework of acceleration project
of developing gas and oil field which cover the study of geophysics, geology and reservoir including : 3D seismic
interpretation, analysis of petrophysics, quantitative and qualitative analysis of well log , behavior of
production
and
reservoir reserves to recommend an optimum structure
development
effort which has result gives a new represented
quantities and qualitative description and good prospect to developed.
Sum and well coordinate that raise absorbent point and completion system and
production
have studied and compiled.
Guidance of acceleration project field
development
has a result that's shown by estimated
production
and good economics
parameter so that can raise
production
of gas and oil of Pertamina immediately.