Click to view page image in pdf format.
7th Middle East Geosciences Conference and Exhibition
Manama, Bahrain
March 27-29, 2006
Testing
: A Case Study from Unity Area, Muglad Basin, Sudan
1 Exploration, Greater Nile Petroleum Operating Company Ltd, Vth floor, Exploration Dept.,
Khartoum tower, Al gamhouria street, Khartoum, 12527, Sudan, phone: 00249912394176, fax: 00249183760048,
[email protected]
2 Exploration Dept., Basin Studies Group, Greater nile Petroleum
Operating Company, Vth Floor, GNPOC tower, Al-gamhouria street, P.O. BOX 12527, Khartoum, Sudan
Testing
injection wells is particularly important for efficient planning and operation of both secondary and tertiary recovery
projects. Satisfactory injection performance over a long period of time and the prompt detection of increasing wellbore
damage are important to the economics of recovery projects. Authors studied both Injectivity and falloff
testing
in liquid-filled,
unit-mobility-ratio reservoirs and discussed methods for determining average reservoir pressure and for analyzing
composite systems in non-unit -mobility ratio reservoirs and well
testing
, its analysis, using the step-rate method. Mobility
ratio less than one suggests an efficient, “piston-like” oil displacement process, while mobility ratios greater than one may
result in inefficient displacement. In the present study, it is observed that the mobility ratio between the injected and in-situ
fluids is near unity, the analysis techniques for injection tests are similar to those developed for
production
tests. Unitmobility
ratio approximation applies for both mature water flood, that initially had mobility ratios significantly different from
unity, and early in the life of Tertiary recovery projects, when little fluid has been injected and injected fluid bank appears as
a skin effect. When the unit-mobility-ratio condition is satisfied, injection well
testing
is analogous to drawdown
testing
, while
shutting in an injection well results in a pressure falloff that is analogous to a pressure buildup test. Injectivity
testing
is
pressure transient
testing
, and is analogous to drawdown
testing
for both constant and variable injection rates. If the
mobility ratio is not unity and radius of investigation has not exceeded the radius of the injected-fluid bank, then, the
effective permeability and skin factor (but not static drainage-area pressure) in the inner zone can still be determined.
Authors had discussed the real case history that has significantly helped in effective reservoir management in Unity area of
Muglad basin.