Click image for enlargement.
Figure 7. Chronology of development drilling during 1993 and 1994. A.
Locations of previously completed wells in Moore-Johnson field area and wells
drilled in 1993 and 1994. Circled reference numbers refer to corresponding
sections in text. B. Contour map of ethane magnitudes
showing geochemical basis
for selection of development well locations. (Well locations modified from Bowen
and Weimer, 2003, and Kansas Geological Survey, 2003.)