--> Drilling Technology Progress and Recommendations for the Fuling Shale Gas Field
[First Hit]

Petroleum Previous HitDrillingNext Hit Techniques, Issue 4, 2018

Datapages, Inc.Print this page

Previous HitDrillingNext Hit Technology Progress and Recommendations for the Fuling Shale Gas Field

Abstract

The Fuling Shale Gas Field is the first large-scale commercially developed shale gas field in China, and its Previous HitdrillingNext Hit technical systems can be used as a model for the Previous HitdrillingNext Hit of other shale gas fields. The development of Previous HitdrillingNext Hit technologies in Fuling Shale Gas Field was divided into four stages, including exploration and discovery, development test, the first-stage production construction, and the second-stage production construction. The Previous HitdrillingNext Hit challenges were discussed in aspects of surface geological characteristics, wellbore stability, hole trajectory control and cementing quality. Aiming at the above challenges, nine key Previous HitdrillingNext Hit technologies were summarized covering platform surface layout, Previous HitwellNext Hit deployment plan, low cost and rapid Previous HitdrillingNext Hit, hole trajectory control, wellbore integrity evaluation, etc, to provide a model or reference for the Previous HitdrillingNext Hit technologies of other shale gas fields. Furthermore, on the basis of "stable production and efficiency improvement, acceleration and cost reduction", the technology required by the further Previous HitdrillingNext Hit of Fuling Shale Gas Field were proposed, and pertinent suggestions on Previous HitdrillingNext Hit technology development were put forward to continuously improve the level of Previous HitdrillingNext Hit technology in the Fuling Shale Gas Field.