--> Optimized and Fast Drilling Technology for Horizontal Shale Gas Wells in Pingqiao and Jiangdong Blocks of Fuling Area
[First Hit]

Petroleum Previous HitDrillingNext Hit Techniques, Issue 3, 2018

Datapages, Inc.Print this page

Optimized and Fast Previous HitDrillingNext Hit Technology for Horizontal Shale Gas Wells in Pingqiao and Jiangdong Blocks of Fuling Area

Abstract

Downhole problems and failures are often encountered while Previous HitdrillingNext Hit the shale gas horizontal wells in Pingqiao and Jiangdong blocks of Fuling Area, which result in low ROP and long Previous HitdrillingNext Hit cycles. Consequently, we studied the latest technologies for optimizing Previous HitdrillingNext Hit and increasing the rate of penetration in shale gas wells. We focused first on conductive and technical casing, which could be optimized to the point that it turned into a double conductor program. We could also optimize the wellbore trajectory using incrementally variable curvature. In addition, the trajectory control technology of vertical Previous HitwellNext Hit section and small build-up section was developed for Previous HitdrillingNext Hit high-steep structures according to the requirement of Previous HitwellNext Hit quality on different Previous HitwellNext Hit sections. The relationship between ROP and Previous HitdrillingNext Hit method is analyzed and the Previous HitdrillingNext Hit methods was optimized according to the characteristics of different formations in different sections. Furthermore anti-shock roller bit, axe tooth PDC bit, and hybrid drill bit are studied and developed to meet requirement from bit performance on lithology, drillability, and abrasiveness of drilled formation. The ?285.8 mm low-speed and high-torque motor and ?171.5 mm all-metal hydraulic oscillator are optimized for ROP enhancment. BT-100 low-density and high inhibiting Previous HitdrillingNext Hit fluid and oil-based gel plugging materials are selected to solve the problem of circulation loss. Hence, the guidelines for optimized and fast directional Previous HitdrillingNext Hit technology for shale gas wells in Pingqiao and Jiangdong blocks could be established through those studies. The technology was applied in 32 wells in Pingqiao and Jiangdong blocks of Fuling Area. By using this technology, the average Previous HitdrillingNext Hit cycle was decreased from the previous 128.00 days to 76.25 days with excellent ROP increasing effect, which provided reference to enhance ROP in Pingqiao and Jiangdong blocks Previous HitwellNext Hit Previous HitdrillingNext Hit.