--> Twenty One Years of CBM Production and Monitoring of the Pine River Subcrop and Gas Seeps. No Depletion.
[First Hit]

AAPG Pacific Section and Rocky Mountain Section Joint Meeting

Datapages, Inc.Print this page

Twenty One Years of CBM Previous HitProductionNext Hit and Monitoring of the Pine River Subcrop and Gas Seeps. No Depletion.

Abstract

Starting in 1994 a ground water, surface water and gas seepage monitoring network was set up in response to observed gas seepage near the subcrop of a producing Coal Bed Methane (CBM) formation and the Pine River in the San Juan Basin, southwestern Colorado. The null hypothesis was that CBM Previous HitproductionNext Hit was releasing gas at the subcrop due to downbasin CBM water pumping. The null hypothesis was tested using down hole video, packer Previous HittestingNext Hit, reservoir/seepage Previous HitproductionNext Hit analysis, temperature tracing, cation water quality, water age and potentiometric head trends. Based on the 21 years of data and analysis the CBM null hypothesis was rejected. Since there was no hydraulic connection between the subcrop and CBM Previous HitproductionTop, there was no depletion from the Pine River. A new null hypothesis that gas seepage was due to long term precipitation trends was formulated in 2000 by the author. It continues to be accepted 14 years later.