--> Abstract: Coupling 4-D Seismic Monitoring and Reservoir Simulation, by John Fanchi; #90082 (2008)
[First Hit]

Datapages, Inc.Print this page

Coupling 4-D Seismic Monitoring and Previous HitReservoirNext Hit Previous HitSimulationNext Hit

John Fanchi
Chevron ETC, Houston, TX

Time-lapse (4D) seismic can be effectively integrated into the Previous HitreservoirNext Hit management process by combining the calculation of Previous HitreservoirNext Hit geophysical attributes with the Previous HitreservoirNext Hit flow Previous HitsimulationNext Hit. This is achieved by embedding a petroelastic algorithm to calculate Previous HitreservoirNext Hit geophysical attributes (P-wave and S-wave velocities and impedances) directly within the flow simulator. Embedded petroelastic models can facilitate integration of 4D seismic in Previous HitreservoirNext Hit management; improve the overall efficiency of the 4D processing and interpretation cycle; better engage Previous HitsimulationNext Hit engineers in the use of 4D seismic; and increase shelf life of production forecasts through better Previous HitreservoirNext Hit characterization and more reliable dynamic Previous HitmodelingNext Hit. Examples will illustrate how this workflow may be used to assess the feasibility of conducting a time-lapse seismic survey, monitor fluid movement, determine the optimum time to schedule 3D seismic surveys for use in time-lapse seismic studies, improve Previous HitreservoirTop characterization, make informed operational changes, and verify geologic sequestration of gases.

AAPG International Conference and Exhibition, Cape Town, South Africa 2008 © AAPG Search and Discovery