--> ABSTRACT: Coal and Coal Gas Resources in the Piceance Basin, Colorado, by Andrew R. Scott, Roger Tyler, W. R. Kaiser, Ronald G. McMurry, and H. S. Nance; #91019 (1996)
[First Hit]

Datapages, Inc.Print this page

Previous HitCoalNext Hit and Previous HitCoalNext Hit Gas Resources in the Piceance Basin, Colorado

Andrew R. Scott, Roger Tyler, W. R. Kaiser, Ronald G. McMurry, and H. S. Nance

Accurate assessment and delineation of Previous HitcoalNext Hit and Previous HitcoalNext Hit gas resources within basins are important aspects of resource development. Previous estimates of Previous HitcoalNext Hit resources in the Piceance Basin range from 248 to 382 billion tons, and in-place Previous HitcoalNext Hit gas resources are generally accepted to be 84 Tcf. Assuming no depth restrictions, we estimate Previous HitcoalNext Hit and Previous HitcoalNext Hit gas resources to be approximately 289 billion tons and 99 Tcf, respectively.

Previous HitCoalNext Hit gas resources in the Piceance were calculated using two different approaches because of the topographic relief in the basin. The first method, which correlated ash-free gas content with depth, overestimated Previous HitcoalNext Hit gas resources under topographically high areas. The second method, based on Previous HitcoalNext Hit rank, eliminated topographic effects but underestimated Previous HitcoalNext Hit gas resources in parts of the basin where unusually high gas contents occur owing to gas migration. Therefore, Previous HitcoalNext Hit gas resources range between 80 and 136 Tcf, depending on the method used.

Assuming no depth restrictions, 80 percent of the Previous HitcoalNext Hit (255 billion tons) and 75 percent of the Previous HitcoalNext Hit gas (76 Tcf) resources are found in the lower part of the Cameo-Wheeler Fairfield Previous HitcoalNext Hit group. The regional distribution of Previous HitcoalNext Hit gas resources generally follows net Previous HitcoalNext Hit trends. Maximum in-place Previous HitcoalTop gas resources exceed 60 Bcf/mi2 in the deeper parts of the basin and are double the 30 Bcf/mi2 previously reported.

AAPG Search and Discover Article #91019©1996 AAPG Convention and Exhibition 19-22 May 1996, San Diego, California