[First Hit]

Datapages, Inc.Print this page

Multidisciplinary Previous HitAnalysisNext Hit, Previous HitFaciesNext Hit Architecture, and Predicitive Model of a Shelf-Edge Deltaic Reservoir System, Mississippi Canyon 109, Gulf of Mexico

YEILDING, CINDY A., and WAYNE W. WILSON, BP Exploration, Houston, TX

The Mississippi Canyon 109 field (offshore Louisiana) comprises middle Pliocene reservoirs in a stratigraphic/structural trap. A 3-D Previous HitseismicNext Hit survey, well logs, and lithologic data were integrated and used to develop detailed reservoir and depositional models. Early drilling results suggested a strong correlation of Previous HitseismicNext Hit amplitude to hydrocarbons. Later drilling confirmed this hypothesis and subsequently net pay maps were generated from the 3-D data using detailed Previous HitseismicNext Hit time-amplitude relationships. These maps illustrate the complexities of the reservoir sands and have been used to plan further drilling in the field.

In addition to defining reservoir characteristics, the 3-D Previous HitseismicNext Hit data, conventional and sidewall cores, and dipmeter and log data were integrated to generate a depositional model for two series of clinoforms (hydrocarbon-bearing, outbuilding delta complexes). Each clinoform has a lower chaotic Previous HitseismicNext Hit Previous HitfaciesNext Hit capped by an upper parallel Previous HitfaciesNext Hit. Conventional core and dipmeter data were used to calibrate stratal characteristics to Previous HitseismicNext Hit Previous HitfaciesNext Hit, revealing that the chaotic Previous HitfaciesNext Hit is composed of slumped sands and shales (delta front slumps) while the upper unit is composed of interbedded sands and shales (mouth bars). Other Previous HitseismicNext Hit Previous HitfaciesNext Hit include a subparallel Previous HitfaciesNext Hit of laminated sands and shales (turbidites/distal deltaics), a parallel Previous HitfaciesTop representing shale intervals, and a silty, eflection-free zone (channel fill).

Both the geologic and reservoir models have been successfully tested by most recent drilling, enabling the field to be approved for commercial development. The 32 slot platform is scheduled to be installed in 1991, with development drilling to commence shortly thereafter.

 

AAPG Search and Discovery Article #91004 © 1991 AAPG Annual Convention Dallas, Texas, April 7-10, 1991 (2009)