--> Multidisciplinary Solution to Enhance Field Development Plan in Burgos Basin, North Mexico
[First Hit]

Datapages, Inc.Print this page

Click to view page image in pdf format.


AAPG Bulletin, Vol. 90 (2006), Program Abstracts (Digital)

7th Middle East Geosciences Conference and Exhibition
Manama, Bahrain
March 27-29, 2006

ABSTRACT: Multidisciplinary Solution to Enhance Field Development Plan in Burgos Basin, North Mexico

Manuel Morales Leal1, Manuel A. Mercado Ortiz2, Guillermo Tirado Vargas2, Roberto Nieves Gonzalez2, Juan Acosta3, Walter Gambaretto3, Facundo Robles4, Jorge Hurtado5, Jorge Pastor6, and Marcelo Gomez7
1 Activo Previous HitIntegralNext Hit Burgos, PEMEX Exploración y Producción, Blvd. Lázaro Cárdenas 605, 2do. Piso, Col. Anzaldúas, Reynosa, 88630, Mexico, phone: 528999217600 Ext. 50279, [email protected]
2 PEMEX, Reynosa
3 Schlumberger, Reynosa
4 Schlumberger, Poza Rica
5 Schlumberger, Ciudad del Carmen
6 Schlumberger, Reynosa, Mexico
7 Schlumberger, Veracruz, Mexico

The Fundador Field accounts for the most relevant gas productivity reservoirs and represents a drilling challenge in Burgos Basin. High and low pressures zones, associated to complex geological events are present. The first six wells drilled from 2002 until February 2005 presented important mud losses, gas influx, three sidetracks and one blow out. The objective of this work is present the contribution of one timely Previous HitintegralNext Hit multidisciplinary solution to these kind of concerns and enhance the field development plan.

Proposed work included geomechanical, seismic, geological, reservoir and drilling analysis. A Mechanical Earth Model was generated. All the information was integrated in a geocellular modeling software. Good match between seismic-geological horizons and geomechanical, reservoir and drilling events were observed. Mechanical Earth Model and properties were layered, up scaled and propagated geo-statistically afterward, to perform a realistic 3D model. Synthetic sets of curves for each location were generated. New drilling plan included an casing shoe setting depth design in accordance to the expected safe drilling window.

After the study, six wells have been drilled. No sidetracks, nor important loses or fishing happened. All new properties obtained from new wells were compared with model forecasts and shows an excellent match. High productivity zones that were identified in the reservoir model, which contributes to improve the field development, represent an additional value. An Previous HitintegralTop multidisciplinary solution like this, can offer the way to enhance the timely development of problematic fields, reducing drilling risks and increasing the profitability. Fundador case is one of these examples.

 

Copyright © 2006. The American Association of Petroleum Geologists. All Rights Reserved.