--> Abstract: Woodford Completion Efficiency Improvement through Applied Geology, by Charlie Smith; #90184 (2013)
[First Hit]

Datapages, Inc.Print this page

Woodford Completion Efficiency Improvement through Applied Geology

Charlie Smith
Halliburton

Previous HitProductionNext Hit results from the Woodford formation are difficult to pre-dict and evaluate. Horizontal wells in this play can produce extremely well, but are sometimes surrounded by poor producers. One of the most frustrating aspects of these wells from the perspective of the completion is the inconsistency of fracture treatments to be effec-tively placed. In specific wells, some treatments pumped as de-signed, but many others could not even initiate breakdown. Some understanding of the geology of the reservoir could contribute to un-derstanding these failures. There is still significant discussion about the best source of geologic knowledge for completion in these uncon-ventional reservoirs, but the Previous HitdevelopmentNext Hit of an efficient completion design is still the desired objective. Different logging technologies to assist in this design have been attempted with varying degrees of success.

A decision was made to establish a control case with an evaluation of conventional practices. The well was drilled and completed following the accepted methods and treatment designs for other Woodford wells in the area. A comparison well would acquire geologic informa-tion through elemental capture, dipole sonic, and nuclear magnetic resonance with the objective of determining rock composition, verti-cal- and horizontal-rock mechanical properties, effective porosity, and permeability. These factors would be used to target completion areas in the horizontal well and design fracture treatments that would cre-ate effective flow geometry from the reservoir to the wellbore.

This paper details some of the completion data in the control well and in a subsequent, geologically-focused well. The results were ex-tremely positive. Fracture treatment placement in the control well was inconsistent. Better knowledge into the geology of the reservoir resulted in improved placement within the well. Statistical improve-ment from 25% to 100% fracture treatment placement efficiency was achieved. Log results and pumping treating records are presented and compared for these situations.

AAPG Search and Discovery Article #90184 © AAPG Woodford Shale Previous HitForumTop, Oklahoma City, Oklahoma, April 11, 2013