--> Abstract: Geophysical Reservoir Monitoring: Where We Are!, by Peter Engbers, Mohamed Al-Mughairy, Fahad Al-Kindy, Helmut Friesacher, Nasser Al-Touqi, Saeed Al-Yarubi, and Issa Al-Quseimi; #90077 (2008)
[First Hit]

Datapages, Inc.Print this page

Geophysical Previous HitReservoirNext Hit Previous HitMonitoringNext Hit: Where We Are!

Peter Engbers1, Mohamed Al-Mughairy2*, Fahad Al-Kindy2, Helmut Friesacher3, Nasser Al-Touqi2, Saeed Al-Yarubi2, and Issa Al-Quseimi2
1BSP, Malaysia
2PDO
3Shell EPE, Aberdeen
*[email protected]

In our land environment, areal Previous HitreservoirNext Hit Previous HitmonitoringNext Hit is not just 4-D Previous HitseismicNext Hit. It can best be achieved by a combination of various geophysical techniques integrated with well-based surveillance methods. These techniques include active Previous HitseismicNext Hit (surface and downhole), passive Previous HitseismicNext Hit (microseismic), surface deformation (GPS and satellite), electromagnetic induction, and gravity measurements. Enhanced oil recovery (EOR) projects are the prime candidates for the application of geophysical Previous HitreservoirNext Hit Previous HitmonitoringNext Hit techniques because of the expected large acoustic effect and the large potential value. With EOR techniques becoming ever more important the use of Previous HitreservoirNext Hit Previous HitmonitoringNext Hit techniques will increase significantly. Over the years several blockers for time-lapse (4D) Previous HitseismicNext Hit have been identified including: (1) limited changes of acoustic properties at Previous HitseismicNext Hit scale caused by low yearly production rates, (2) poor sweep, (3) stiff carbonate matrix, (4) dense surface infrastructure, (5) small areal scale of an injection pattern, (6) lack of suitable baseline surveys, and (6) difficult reservoirs. The critical success factor for those geophysical Previous HitreservoirNext Hit-Previous HitmonitoringNext Hit projects is the full integration with the well-based Previous HitmonitoringNext Hit data into the dynamic Previous HitreservoirNext Hit model. Involvement at the beginning of a field development program by geophysicists is essential for the success of such projects, as tailor-made solutions require adequate attention for project management, scoping, justification, technical design, tendering and contracting. Based on recent experiences a five-step approach evolved for geophysical Previous HitreservoirNext Hit Previous HitmonitoringTop projects. These include: (1) opportunity screening and selection of relevant technologies, (2) detailed design, (3) implementation, (4) data acquisition and processing, and (5) detailed integrated interpretation.

 

AAPG Search and Discovery Article #90077©2008 GEO 2008 Middle East Conference and Exhibition, Manama, Bahrain