--> Abstract: Avoca, New York, Salt Cavern Gas Storage Facility, by D. C. Morrill and J. Makowski; #90954 (1995).

Datapages, Inc.Print this page

Abstract: Avoca, New York, Salt Cavern Gas Storage Facility

David C. Morrill, J. Makowski

The first salt cavern natural gas storage facility in the northeastern United States designed to serve the interstate gas market is being developed by J Makowski Associates and partners at Avoca in Steuben County, New York. Multiple caverns will be leached at a depth of about 3800 ft from an approximately 100 ft interval of salt within the F unit of the Syracuse Formation of the Upper Silurian Salina Group. The facility is designed to provide 5 Bcf of working gas capacity and 500 MMcfd of deliverability within an operating cavern pressure range between 760 psi and 2850 psi. Fresh water for leaching will be obtained from the Cohocton River aquifer at a maximum rate of 3 million gallons per day and produced brine will be injected into deep permeable Cambrian age sandstones nd dolostones. Gas storage service is anticipated to commence in the Fall of 1997 with 2 Bcf of working gas capacity and the full 5 Bcf or storage service is scheduled to be available in the Fall of 1999.

AAPG Search and Discovery Article #90954©1995 AAPG Eastern Section, Schenectady, New York